Foles de refrigeração a água para ASIC – Guia de montagem e compra
ASIC water cooling bellows. Transparent corrugated FEP tubing for connections between matched miner cold plates, manifolds and a water cooling radiator. Entry option price; confirm size and scope.
$1.40
9999 em stock
Forma de pagamento
Dada a rápida evolução do mercado, os preços das máquinas de mineração podem sofrer flutuações; por favor, confirme o preço mais recente junto da nossa equipa de vendas antes de efetuar o pagamento, para evitar perdas financeiras.
Poupe nos custos de envio ao encomendar duas ou mais máquinas! Contacte hoje mesmo a nossa equipa de vendas para obter o melhor orçamento.
Descrição:
ASIC water cooling bellows: Transparent corrugated FEP tubing for connections between matched miner cold plates, manifolds and a water cooling radiator. PunkHash helps buyers define the part and installation scope before combining it with the rest of a mining cooling circuit.
ASIC water cooling bellows: selection details
| Material description | Transparent FEP corrugated tubing |
|---|---|
| Listed options | D8 and D10; confirm exact bore and outside diameter |
| Utilização típica | Cold plate-to-manifold or matched radiator connections |
| Order details | Specify length, quantity and matching fitting type |
D8 and D10 are selection labels, not enough information to establish fit. Ask for measured inside and outside diameters, the supplied length and the selling unit before purchase. The displayed entry price is a reference for the smallest listed option, not a complete plumbing kit.
Match the complete connection
Measure the pipe bore, outside diameter, port thread and available installation clearance. The sealing material must suit the selected coolant and working temperature. Confirm the installation pressure with the system supplier. Avoid sharp bends, unsupported hose loads and mixing visually similar fitting sizes. A qualified installer should check the assembled circuit before the miner is energized.
Related electronics and service parts
Compare replacement control boards by controller revision and firmware. Check mining power supplies against the miner voltage, output and communication interface. These catalogs are matching resources; a cooling accessory does not establish electronic compatibility.
Buyer questions about the ASIC water cooling bellows
What information is needed for a matched quote?
Send the exact miner model, board or part revision, clear connection photographs, quantity and delivery country. For a radiator or pump, include the intended loop arrangement and operating heat load. Confirm the selected configuration, supplied accessories and selling unit in the itemized quotation.
How should the installation location affect selection?
Share the summer ambient temperature and available electrical supply. Sites in the UAE or Texas should evaluate heat rejection at their hottest expected conditions. In colder locations, discuss freeze protection and start-up conditions with the system designer. Shipping cost and delivery time depend on destination and the confirmed order.
Request a matched ASIC water cooling bellows quotation from PunkHash. We can review the proposed component combination before you place the order.

Sobre os transportes:Os mineradores em stock serão enviados no prazo de 3 dias úteis. No caso de encomendas em grande quantidade enviadas através da DHL Express, UPS, FedEx ou TNT, por favor, considere um prazo adicional de 1 a 2 dias para o processamento.
Os prazos de entrega dos mineradores encomendados antecipadamente dependem do calendário de produção da fábrica. As datas estimadas de envio são indicadas na página da encomenda; no entanto, os envios efetivos podem sofrer atrasos devido a questões relacionadas com a produção.
O nosso processo de envio funciona segundo o princípio “primeiro a pagar, primeiro a ser enviado”. Assim que o pagamento integral for recebido, faremos o possível para organizar o envio o mais rapidamente possível. Os pagamentos efetuados por transferência bancária (T/T) podem demorar entre 3 a 7 dias úteis a serem verificados, enquanto os pagamentos efetuados através de criptomoedas são normalmente confirmados no prazo de algumas horas a 1 dia útil.
O envio internacional demora normalmente entre 5 e 8 dias úteis; no caso de regiões remotas, os prazos de entrega podem prolongar-se para 8 a 10 dias úteis.
*Todas as transações constituem vendas definitivas e não são reembolsáveis após a sua conclusão. Agradecemos a sua compreensão, uma vez que esta é uma prática habitual no setor.
Avaliações
Limpar filtrosAinda não existem avaliações.