APW11A1216-1a Power Supply for T21

APW11A1216-1a for Antminer T21 air-cooled configuration. Match the complete revision and connections. Send model, quantity and destination to PunkHash for quotation.

$330.00

9999 em stock

Forma de pagamento

1487a2a7-2d12-464b-a0aa-6a3c23b13eac - convertido a partir de -png

Dada a rápida evolução do mercado, os preços das máquinas de mineração podem sofrer flutuações; por favor, confirme o preço mais recente junto da nossa equipa de vendas antes de efetuar o pagamento, para evitar perdas financeiras.

Poupe nos custos de envio ao encomendar duas ou mais máquinas! Contacte hoje mesmo a nossa equipa de vendas para obter o melhor orçamento.

Descrição:

APW11A1216-1a: reliable repair-part selection

APW11A1216-1a is available for sourcing through PunkHash for matched ASIC miner maintenance. APW11A1216-1a is identified for the T21 air-cooled mining configuration. Despite its APW11 family name, it should not be selected as a generic Hydro miner PSU without matching the complete model and electrical requirements.

APW11A1216-1a identification and application

Part type Replacement mining power supply
Reference application Antminer T21 air-cooled configuration
Selection rule Full PSU label, electrical supply and connectors
Package Confirm cables, fittings and included accessories

How to select the APW11A1216-1a

The supplier reference specifies 380–415V AC, three-phase plus protective earth, and a 12–16V main output. This is not an ordinary single-phase wall-socket installation. Verify the complete label, connector arrangement and site supply before ordering.

Diagnose the equipment before ordering

A power fault can originate in the electrical supply, input connection, output connection or the miner load. Record the fault and have the installation checked before choosing a replacement PSU. Replacing a supply without addressing the underlying issue can leave the original fault unresolved.

APW11A1216-1a installation planning

Ask a qualified technician to match input voltage and phase, protective earth, output characteristics, communications connection and mechanical fit. Isolate power before handling the unit. For a liquid-cooled supply, confirm the coolant connections and installation requirements for the selected model as well.

Buyer questions about APW11A1216-1a

What information does PunkHash need for a quotation?

Send the miner model, full installed part marking, board or PSU revision, clear connection photographs, required quantity and destination country. For a mixed order, list each model and revision separately. This makes it possible to identify the requested hardware without treating similar-looking parts as equivalent.

Are condition, delivery and warranty fixed for every order?

No. Ask for the selected batch condition, included items, final price, dispatch plan and warranty in the quotation. A reference photograph shows the product family and does not establish the condition or package contents of every available batch. Shipping charges and import requirements depend on destination.

Does replacing the APW11A1216-1a guarantee that the miner is repaired?

No. The replacement must match the diagnosed fault and the installed hardware. Confirm the exact configuration before payment, retain the original part identification and document the repair result. A correct part number is an important selection step, but it is not a substitute for diagnosis.

Prepare a matched APW11A1216-1a order

For an international repair order, include your delivery country and postal code so the quotation can address the shipment rather than assume a universal freight cost. Farm operators should also identify the installed miner variants and keep separate spare-part records for each revision. Send model, quantity and destination for quotation.

Explore PunkHash mining accessories and compare the supplier product identification reference for the selected item. Product references do not transfer another seller’s warranty or delivery commitments to PunkHash.

APW11A1216-1a - PunkHash
Reference appearance and views. Quantity, version, condition and package contents are confirmed in the quotation.

Sobre os transportes:Os mineradores em stock serão enviados no prazo de 3 dias úteis. No caso de encomendas em grande quantidade enviadas através da DHL Express, UPS, FedEx ou TNT, por favor, considere um prazo adicional de 1 a 2 dias para o processamento.
Os prazos de entrega dos mineradores encomendados antecipadamente dependem do calendário de produção da fábrica. As datas estimadas de envio são indicadas na página da encomenda; no entanto, os envios efetivos podem sofrer atrasos devido a questões relacionadas com a produção.
O nosso processo de envio funciona segundo o princípio “primeiro a pagar, primeiro a ser enviado”. Assim que o pagamento integral for recebido, faremos o possível para organizar o envio o mais rapidamente possível. Os pagamentos efetuados por transferência bancária (T/T) podem demorar entre 3 a 7 dias úteis a serem verificados, enquanto os pagamentos efetuados através de criptomoedas são normalmente confirmados no prazo de algumas horas a 1 dia útil.
O envio internacional demora normalmente entre 5 e 8 dias úteis; no caso de regiões remotas, os prazos de entrega podem prolongar-se para 8 a 10 dias úteis.
*Todas as transações constituem vendas definitivas e não são reembolsáveis após a sua conclusão. Agradecemos a sua compreensão, uma vez que esta é uma prática habitual no setor.

0 avaliações
0
0
0
0
0

Avaliações

Limpar filtros

Ainda não existem avaliações.

Seja o primeiro a avaliar “APW11A1216-1a Power Supply for T21”

O seu endereço de email não será publicado. Campos obrigatórios marcados com *

Tem de ter sessão iniciada para poder adicionar fotos à sua avaliação.