Dual Miner Mute Unit (220V)
The dual miner mute unit is a 220V twin-outlet blower assembly for a carefully measured two-machine airflow project. Its long metal housing offers a different layout from individual blower kits and requires enough space for both miner connections.
- Input: 220V; verify frequency and nameplate
- Listed motor power: 120W reference
- Unit dimensions: 650 × 220 × 300mm
Entry configuration price. Confirm the selected size, controller and packing list before ordering.
$80.00
9999 disponibles
Forma de pago
Dado que el mercado cambia rápidamente, los precios de la maquinaria minera pueden variar; por favor, confirma el precio más reciente con nuestro equipo de ventas antes de realizar el pago para evitar pérdidas económicas.
¡Ahorra en gastos de envío al pedir dos o más máquinas! Ponte en contacto con nuestro equipo de ventas hoy mismo para obtener el mejor presupuesto.
Descripción:
The dual miner mute unit is a 220V twin-outlet blower assembly for a carefully measured two-machine airflow project. Its long metal housing offers a different layout from individual blower kits and requires enough space for both miner connections.
The dual-machine format describes the physical arrangement, not an approval for any two high-power ASICs. Confirm the total heat load, outlet fit and required airflow before selecting it for newer equipment. Each connected miner needs independent temperature monitoring during commissioning.
Dual Miner Mute Unit: specifications and selection
| Input | 220V; verify frequency and nameplate |
|---|---|
| Listed motor power | 120W reference |
| Unit dimensions | 650 × 220 × 300mm |
| Packing dimensions | 680 × 240 × 320mm |
| Layout | Twin miner-side openings; verify adapter sizes |
Which miners and installations are suitable?
A matched two-miner air-cooled installation only after checking both machine models, combined thermal demand and the available airflow. Request confirmation for modern high-power models rather than relying on the two-machine label.
The Dual miner mute unit is an aftermarket accessory. Compatibility references identify selection candidates, not original-manufacturer endorsement or an unconditional fit guarantee. The quotation should identify the exact dimensions, supplied configuration and included accessories.

Installation and operating checks
Measure the original fan frame, mounting holes, miner opening and intended duct diameter before selecting an adapter. Keep the inlet unobstructed and avoid recirculating hot exhaust. A short, supported exhaust route with gentle bends is easier to evaluate than a long compressed hose.
Record the original chip temperatures, fan readings and room temperature at a stable mining load. After installation, compare those readings at the same load and ambient conditions. Check the power-supply cooling path separately. Reduce load or stop the machine if temperatures or alarms move outside the manufacturer’s limits.
If a fan-signal simulator is needed, confirm its connector and firmware compatibility first. A simulator does not prove that air is moving. Retain thermal protection, verify the blower starts reliably, and test controller behavior after a power interruption. Electrical installation requires a correctly rated supply and qualified handling.
Selection questions
Can this unit cool any two ASIC miners?
No. Chassis fit and heat load must both be checked. Start with each miner at a verified operating condition, monitor both machines under load, and retain their protective shutdown functions.
What information helps PunkHash check an order?
Send the full miner model and revision, clear fan and PSU-label photos, the measured connection sizes, required quantity and destination voltage and frequency. For a cooling project, include the room temperature and planned exhaust route. These details make the recommendation more useful than a brand-only enquiry.
Related control boards and power supplies
For model-specific repair planning, review CV1835 Control Board for Antminer; Fuente de alimentación APW17 1215 para Antminer S21 y S19j XP. These are separate products. Match the board revision, PSU label, output range and connectors before adding any replacement to an order; a cooling accessory does not establish electrical compatibility.
For Antminer operating limits and original instructions, consult BITMAIN Support. Follow the corresponding original manufacturer guidance for other brands.
To select the Dual miner mute unit, contact PunkHash with your installation details. Ask us to confirm the configuration, accessories, lead time and shipping quote before payment.
Información sobre el transporte:Los mineros disponibles en stock se enviarán en un plazo de 3 días laborables. Para pedidos al por mayor enviados a través de DHL Express, UPS, FedEx o TNT, hay que tener en cuenta que el proceso de tramitación puede tardar entre 1 y 2 días adicionales.
Los plazos de entrega de los mineros reservados dependen del calendario de producción de la fábrica. Las fechas estimadas de envío se indican en la página del pedido; sin embargo, los envíos reales pueden sufrir retrasos debido a problemas relacionados con la producción.
Nuestro proceso de envío funciona según el principio de “por orden de pago”. Una vez recibido el pago completo, nos esforzaremos por tramitar el envío lo antes posible. Los pagos realizados mediante transferencia bancaria (T/T) pueden tardar entre 3 y 7 días laborables en verificarse, mientras que los pagos realizados mediante criptomonedas suelen confirmarse en un plazo de unas horas a 1 día laborable.
Los envíos internacionales suelen tardar entre 5 y 8 días laborables; en el caso de las zonas más alejadas, los plazos de entrega pueden prolongarse hasta entre 8 y 10 días laborables.
*Todas las transacciones se consideran ventas definitivas y no son reembolsables una vez realizadas. Agradecemos su comprensión, ya que se trata de una práctica habitual en el sector.
Valoraciones
Borrar filtrosNo hay valoraciones aún.