Dual Miner Mute Unit (220V)

The dual miner mute unit is a 220V twin-outlet blower assembly for a carefully measured two-machine airflow project. Its long metal housing offers a different layout from individual blower kits and requires enough space for both miner connections.

  • Input: 220V; verify frequency and nameplate
  • Listed motor power: 120W reference
  • Unit dimensions: 650 × 220 × 300mm

Entry configuration price. Confirm the selected size, controller and packing list before ordering.

$80.00

9999 متوفر في المخزون

طريقة الدفع

1487a2a7-2d12-464b-a0aa-6a3c23b13eac - تم تحويله من -png

نظرًا للتغيرات السريعة التي يشهدها السوق، قد تتقلب أسعار آلات التعدين؛ لذا يرجى التأكد من أحدث الأسعار مع فريق المبيعات لدينا قبل إجراء الدفع لتجنب الخسائر المالية.

وفر في تكاليف الشحن عند طلب جهازين أو أكثر! اتصل بفريق المبيعات لدينا اليوم للحصول على أفضل عرض أسعار.

الوصف:

The dual miner mute unit is a 220V twin-outlet blower assembly for a carefully measured two-machine airflow project. Its long metal housing offers a different layout from individual blower kits and requires enough space for both miner connections.

The dual-machine format describes the physical arrangement, not an approval for any two high-power ASICs. Confirm the total heat load, outlet fit and required airflow before selecting it for newer equipment. Each connected miner needs independent temperature monitoring during commissioning.

Dual Miner Mute Unit: specifications and selection

Input 220V; verify frequency and nameplate
Listed motor power 120W reference
Unit dimensions 650 × 220 × 300mm
Packing dimensions 680 × 240 × 320mm
Layout Twin miner-side openings; verify adapter sizes

Which miners and installations are suitable?

A matched two-miner air-cooled installation only after checking both machine models, combined thermal demand and the available airflow. Request confirmation for modern high-power models rather than relying on the two-machine label.

The Dual miner mute unit is an aftermarket accessory. Compatibility references identify selection candidates, not original-manufacturer endorsement or an unconditional fit guarantee. The quotation should identify the exact dimensions, supplied configuration and included accessories.

Dual miner mute unit - PunkHash product view

Installation and operating checks

Measure the original fan frame, mounting holes, miner opening and intended duct diameter before selecting an adapter. Keep the inlet unobstructed and avoid recirculating hot exhaust. A short, supported exhaust route with gentle bends is easier to evaluate than a long compressed hose.

Record the original chip temperatures, fan readings and room temperature at a stable mining load. After installation, compare those readings at the same load and ambient conditions. Check the power-supply cooling path separately. Reduce load or stop the machine if temperatures or alarms move outside the manufacturer’s limits.

If a fan-signal simulator is needed, confirm its connector and firmware compatibility first. A simulator does not prove that air is moving. Retain thermal protection, verify the blower starts reliably, and test controller behavior after a power interruption. Electrical installation requires a correctly rated supply and qualified handling.

Selection questions

Can this unit cool any two ASIC miners?

No. Chassis fit and heat load must both be checked. Start with each miner at a verified operating condition, monitor both machines under load, and retain their protective shutdown functions.

What information helps PunkHash check an order?

Send the full miner model and revision, clear fan and PSU-label photos, the measured connection sizes, required quantity and destination voltage and frequency. For a cooling project, include the room temperature and planned exhaust route. These details make the recommendation more useful than a brand-only enquiry.

Related control boards and power supplies

For model-specific repair planning, review CV1835 Control Board for Antminer; مصدر الطاقة APW17 1215 لأجهزة Antminer S21 وS19j XP. These are separate products. Match the board revision, PSU label, output range and connectors before adding any replacement to an order; a cooling accessory does not establish electrical compatibility.

For Antminer operating limits and original instructions, consult BITMAIN Support. Follow the corresponding original manufacturer guidance for other brands.

To select the Dual miner mute unit, contact PunkHash with your installation details. Ask us to confirm the configuration, accessories, lead time and shipping quote before payment.

حول وسائل النقل:سيتم شحن أجهزة التعدين المتوفرة في المخزون في غضون 3 أيام عمل. أما بالنسبة للطلبات بالجملة التي يتم شحنها عبر DHL Express أو UPS أو FedEx أو TNT، فيرجى الانتظار لمدة يوم إلى يومين إضافيين لإتمام إجراءات الشحن.
تعتمد مواعيد تسليم أجهزة التعدين التي تم طلبها مسبقًا على الجدول الزمني للإنتاج في المصنع. وتُعرض تواريخ الشحن التقديرية في صفحة الطلب؛ ومع ذلك، قد تتأخر عمليات الشحن الفعلية بسبب مشكلات متعلقة بالإنتاج.
تعمل عملية الشحن لدينا وفق مبدأ “من يدفع أولاً، يُشحن أولاً”. وبمجرد استلام المبلغ بالكامل، سنبذل قصارى جهدنا لترتيب الشحن في أسرع وقت ممكن. قد تستغرق عمليات التحقق من المدفوعات التي تتم عبر التحويل المصرفي (T/T) من 3 إلى 7 أيام عمل، بينما يتم تأكيد المدفوعات التي تتم عبر العملات المشفرة عادةً في غضون بضع ساعات إلى يوم عمل واحد.
يستغرق الشحن الدولي عادةً من 5 إلى 8 أيام عمل؛ أما بالنسبة للمناطق النائية، فقد تمتد مدة الشحن إلى 8–10 أيام عمل.
*تُعتبر جميع المعاملات مبيعات نهائية ولا يمكن استرداد قيمتها بمجرد إتمامها. ونقدر تفهمكم بأن هذه ممارسة معتادة في هذا القطاع.

0 مراجعة
0
0
0
0
0

المراجعات

مسح الفلاتر

لا توجد مراجعات بعد.

كن أول من يقيم “Dual Miner Mute Unit (220V)”

لن يتم نشر عنوان بريدك الإلكتروني. الحقول الإلزامية مشار إليها بـ *

يجب أن تكون مسجلاً للدخول لتتمكن من إضافة صور إلى مراجعتك.