BITMAIN U3S21EXPH 860T

The BITMAIN U3S21EXPH is a 3U rack-mounted hydro-cooled Bitcoin miner delivering 860 TH/s at 11180W with an energy efficiency of 13 J/TH. Designed for high-density mining infrastructure, it combines exceptional computing density, efficient liquid cooling and industrial-scale deployment.

$8,199.00

Payment Method

1487a2a7-2d12-464b-a0aa-6a3c23b13eac-转换自-png

Given the rapidly changing market, mining machine prices may fluctuate; please confirm the latest price with our sales team before making payment to avoid financial losses.

Save on shipping costs when you order two or more machines! Contact our sales team today to get the best quote.

Description:

BITMAIN U3S21EXPH 860T Hydro Bitcoin Miner

860 TH/s High-Density SHA-256 Mining in a 3U Platform

The BITMAIN U3S21EXPH, also known as the Antminer S21e XP Hyd 3U, is a high-density rack-mounted hydro-cooled ASIC miner designed for professional Bitcoin mining farms.

Delivering 860 TH/s of SHA-256 computing power with a rated consumption of 11180W, the U3S21EXPH achieves an energy efficiency of approximately 13 J/TH.

Its 3U form factor consolidates substantial computing power into a standardized rack-compatible chassis, making it suitable for purpose-built hydro mining facilities, centralized server rooms and large-scale container deployments.

Key Features

  • 860 TH/s rated hashrate
  • 11180W rated power consumption
  • 13 J/TH energy efficiency
  • 3U rack-mounted form factor
  • Hydro-cooled thermal architecture
  • SHA-256 mining algorithm
  • 380–415V industrial power input
  • RJ45 Ethernet connection
  • Designed for centralized high-density deployment
  • Suitable for continuous industrial operation

Technical Specifications

Specification Value
Manufacturer BITMAIN
Model U3S21EXPH
Alternative Name Antminer S21e XP Hyd 3U
Hashrate 860 TH/s
Power Consumption 11180W
Energy Efficiency 13 J/TH
Algorithm SHA-256
Primary Coin

About transportation:In-stock miners will be shipped within 3 business days. For bulk orders shipped via DHL Express, UPS, FedEx, or TNT, please allow an additional 1–2 days for processing.
Delivery times for pre-order miners depend on the factory’s production schedule. Estimated shipping dates are provided on the order page; however, actual shipments may be subject to delays due to production-related issues.
Our shipping process operates on a “first-pay, first-ship” basis. Once full payment has been received, we will strive to arrange shipment as quickly as possible. Payments made via bank wire transfer (T/T) may take 3–7 business days to verify, whereas payments made via cryptocurrency are typically confirmed within a few hours to 1 business day.
International shipping typically takes 5–8 business days; for remote regions, transit times may extend to 8–10 business days.
*All transactions constitute final sales and are non-refundable once completed. We appreciate your understanding that this is standard practice within the industry.