BITMAIN ANTSPACE HW5 1.2MW Hydro Mining Container

Deploy up to 210 Antminer S19 and S21 Hydro miners with the BITMAIN ANTSPACE HW5 1.2MW dry-wet cooling container. Request project pricing.

$52,900.00

Payment Method

1487a2a7-2d12-464b-a0aa-6a3c23b13eac-转换自-png

Given the rapidly changing market, mining machine prices may fluctuate; please confirm the latest price with our sales team before making payment to avoid financial losses.

Save on shipping costs when you order two or more machines! Contact our sales team today to get the best quote.

Description:

BITMAIN ANTSPACE HW5 1200kW Hydro Mining Container

1.2MW Integrated Hydro-Cooling Solution for Up to 210 ASIC Miners

The BITMAIN ANTSPACE HW5 is a 40-foot industrial hydro-cooling mining container designed for efficient, large-scale cryptocurrency mining deployment. With a rated heat dissipation capacity of 1200kW, the HW5 can accommodate up to 210 compatible BITMAIN S19 Hydro and S21 Hydro series miners.

Combining a hydro mining container with a dry-wet cooling tower, the ANTSPACE HW5 provides an integrated infrastructure solution for new mining farms, modular capacity expansion and high-density hydro ASIC deployment.

Key Features

• Up to 210 hydro-cooled ASIC miners
• 1200kW rated heat dissipation capacity
• Compatible with BITMAIN S19 Hydro and S21 Hydro series
• Integrated 40-foot container design
• Closed-circuit dry-wet cooling tower
• Reference PUE of 1.032
• Designed for rapid industrial deployment
• Reduced on-site piping and installation complexity
• Suitable for modular mining farm expansion

Integrated 1.2MW Mining Infrastructure

The ANTSPACE HW5 integrates miner racks, power distribution, internal piping, monitoring and hydro-cooling infrastructure into a standardized container solution. Its modular design helps mining operators reduce project construction time and deploy additional computing capacity in controlled phases.

Compared with building a conventional mining facility from the ground up, a containerized system can simplify equipment planning, transportation, installation and future expansion.

Dry-Wet Cooling Tower

The HW5 uses a closed-circuit dry-wet cooling tower with a rated heat dissipation capacity of 1200kW. The cooling system is engineered to maintain a reference outlet-water temperature of 35°C at a 28°C wet-bulb temperature.

Reference water consumption is approximately 0.7–1.3m³ per hour, depending on environmental conditions and operating load. Cooling tower power consumption is approximately 15–29kW.

Technical Specifications

Model: ANTSPACE HW5 V1
Cooling Type: Hydro Cooling with Dry-Wet Tower
Container Size: 40-Foot
Dimensions: 12192 × 2438 × 2896mm
Miner Capacity: Up to 210 Units
Official Miner Compatibility: S19 Hydro and S21 Hydro Series
Rated Heat Dissipation: 1200kW
Reference Operating Power: 1062kW
Reference PUE: 1.032
Input Voltage: 400V ±5%
Frequency: 50/60Hz
Main Switch: 1200A × 2
Rated Current: ≤986A
Maximum Current per Miner: ≤10A
Required Coolant Flow: ≥85m³/h
Shipping Weight: Approximately 14 Tons
Operating Weight: Approximately 24 Tons
Operating Temperature: -25°C to 40°C
Relative Humidity: 10%–90%
Cooling Tower Noise: Approximately 70dBA at 15m under specified conditions
Water Supply Connection: DN40
Drain Connection: DN65

Suitable Applications

• New hydro-cooled Bitcoin mining farms
• Expansion of existing ANTSPACE installations
• High-density Antminer S19 Hydro and S21 Hydro deployment
• Mining projects with limited construction schedules
• Modular 1MW-class mining infrastructure
• International mining projects requiring standardized container deployment

Site and Installation Requirements

The ANTSPACE HW5 requires a hardened, level foundation capable of supporting at least 36 tons. A minimum two-meter unobstructed air-inlet area should be reserved around the cooling tower.

A crane with a lifting capacity of at least 20 tons is recommended for unloading and installation.

External transformers, power cables, cable trays, distribution boxes, foundations, stairs and other supporting infrastructure may not be included in the standard configuration. Final project scope must be confirmed before ordering.

BITMAIN states that one 2500kVA transformer can support two ANTSPACE HW5 units under the reference configuration. Final transformer sizing, cable selection and protection settings must be reviewed by a qualified electrical engineer according to the actual miner model, local grid standard, altitude and ambient conditions.

Miner Compatibility

The official HW5 specification lists compatibility with BITMAIN S19 Hydro and S21 Hydro series miners.

Compatibility with newer S23 Hydro models or mixed miner configurations must be confirmed according to power limits, coolant flow, firmware, connectors and the selected HW5 configuration before purchase.

Why Buy from Us?

• Hong Kong stock and international delivery options
• Project-based pricing for containers and miners
• Configuration support before shipment
• Miner and container compatibility verification
• Logistics, installation and commissioning assistance
• Optional complete mining-site solution
• After-sales technical coordination

Frequently Asked Questions

How many miners can the ANTSPACE HW5 hold?

The HW5 can accommodate up to 210 compatible hydro-cooled ASIC miners. Actual capacity depends on miner dimensions, power consumption, coolant requirements and project configuration.

Does the 1200kW rating mean the container always consumes 1200kW?

No. The 1200kW figure refers primarily to the rated heat dissipation capacity of the cooling system. BITMAIN lists a reference operating power of 1062kW for the HW5 configuration.

Which miners are officially supported?

BITMAIN officially lists the S19 Hydro and S21 Hydro series. Other miner models should be confirmed before ordering.

How much water does the cooling tower use?

Reference water consumption is approximately 0.7–1.3m³ per hour. Actual consumption depends on temperature, humidity, operating load and local water conditions.

Is a transformer included?

Transformers and external electrical infrastructure are generally not included unless they are specifically listed in the commercial quotation.

Is the ANTSPACE HW5 ready to operate immediately after delivery?

The container simplifies deployment, but the site must still provide a suitable foundation, transformer, power cables, network connection, water supply, drainage and lifting equipment.

Request a Project Quotation

Contact us for current availability, international freight, miner compatibility and a complete ANTSPACE HW5 deployment quotation.

Please provide:

• Destination country and delivery address
• Required number of containers
• Intended miner model and quantity
• Local input voltage and frequency
• Ambient temperature and site elevation
• Required installation or commissioning services

Price: Request a Quote
Availability: Hong Kong Stock / Project Order

About transportation:In-stock miners will be shipped within 3 business days. For bulk orders shipped via DHL Express, UPS, FedEx, or TNT, please allow an additional 1–2 days for processing.
Delivery times for pre-order miners depend on the factory’s production schedule. Estimated shipping dates are provided on the order page; however, actual shipments may be subject to delays due to production-related issues.
Our shipping process operates on a “first-pay, first-ship” basis. Once full payment has been received, we will strive to arrange shipment as quickly as possible. Payments made via bank wire transfer (T/T) may take 3–7 business days to verify, whereas payments made via cryptocurrency are typically confirmed within a few hours to 1 business day.
International shipping typically takes 5–8 business days; for remote regions, transit times may extend to 8–10 business days.
*All transactions constitute final sales and are non-refundable once completed. We appreciate your understanding that this is standard practice within the industry.