Dual Miner Mute Unit (220V)
The dual miner mute unit is a 220V twin-outlet blower assembly for a carefully measured two-machine airflow project. Its long metal housing offers a different layout from individual blower kits and requires enough space for both miner connections.
- Input: 220V; verify frequency and nameplate
- Listed motor power: 120W reference
- Unit dimensions: 650 × 220 × 300mm
Entry configuration price. Confirm the selected size, controller and packing list before ordering.
$80.00
9999 vorrätig
Zahlungsart
Angesichts der sich rasch verändernden Marktlage können die Preise für Bergbaumaschinen Schwankungen unterliegen. Bitte erkundigen Sie sich vor der Zahlung bei unserem Vertriebsteam nach dem aktuellen Preis, um finanzielle Verluste zu vermeiden.
Sparen Sie Versandkosten, wenn Sie zwei oder mehr Maschinen bestellen! Kontaktieren Sie noch heute unser Vertriebsteam, um das beste Angebot zu erhalten.
Beschreibung:
The dual miner mute unit is a 220V twin-outlet blower assembly for a carefully measured two-machine airflow project. Its long metal housing offers a different layout from individual blower kits and requires enough space for both miner connections.
The dual-machine format describes the physical arrangement, not an approval for any two high-power ASICs. Confirm the total heat load, outlet fit and required airflow before selecting it for newer equipment. Each connected miner needs independent temperature monitoring during commissioning.
Dual Miner Mute Unit: specifications and selection
| Input | 220V; verify frequency and nameplate |
|---|---|
| Listed motor power | 120W reference |
| Unit dimensions | 650 × 220 × 300mm |
| Packing dimensions | 680 × 240 × 320mm |
| Layout | Twin miner-side openings; verify adapter sizes |
Which miners and installations are suitable?
A matched two-miner air-cooled installation only after checking both machine models, combined thermal demand and the available airflow. Request confirmation for modern high-power models rather than relying on the two-machine label.
The Dual miner mute unit is an aftermarket accessory. Compatibility references identify selection candidates, not original-manufacturer endorsement or an unconditional fit guarantee. The quotation should identify the exact dimensions, supplied configuration and included accessories.

Installation and operating checks
Measure the original fan frame, mounting holes, miner opening and intended duct diameter before selecting an adapter. Keep the inlet unobstructed and avoid recirculating hot exhaust. A short, supported exhaust route with gentle bends is easier to evaluate than a long compressed hose.
Record the original chip temperatures, fan readings and room temperature at a stable mining load. After installation, compare those readings at the same load and ambient conditions. Check the power-supply cooling path separately. Reduce load or stop the machine if temperatures or alarms move outside the manufacturer’s limits.
If a fan-signal simulator is needed, confirm its connector and firmware compatibility first. A simulator does not prove that air is moving. Retain thermal protection, verify the blower starts reliably, and test controller behavior after a power interruption. Electrical installation requires a correctly rated supply and qualified handling.
Selection questions
Can this unit cool any two ASIC miners?
No. Chassis fit and heat load must both be checked. Start with each miner at a verified operating condition, monitor both machines under load, and retain their protective shutdown functions.
What information helps PunkHash check an order?
Send the full miner model and revision, clear fan and PSU-label photos, the measured connection sizes, required quantity and destination voltage and frequency. For a cooling project, include the room temperature and planned exhaust route. These details make the recommendation more useful than a brand-only enquiry.
Related control boards and power supplies
For model-specific repair planning, review CV1835-Steuerplatine für Antminer; APW17 1215 Netzteil für Antminer S21 und S19j XP. These are separate products. Match the board revision, PSU label, output range and connectors before adding any replacement to an order; a cooling accessory does not establish electrical compatibility.
For Antminer operating limits and original instructions, consult BITMAIN Support. Follow the corresponding original manufacturer guidance for other brands.
To select the Dual miner mute unit, contact PunkHash with your installation details. Ask us to confirm the configuration, accessories, lead time and shipping quote before payment.
Zum Thema Verkehr:Vorrätige Miner werden innerhalb von 3 Werktagen versandt. Bei Großbestellungen, die per DHL Express, UPS, FedEx oder TNT versandt werden, rechnen Sie bitte mit einer zusätzlichen Bearbeitungszeit von 1–2 Tagen.
Die Lieferzeiten für vorbestellte Miner hängen vom Produktionsplan des Herstellers ab. Die voraussichtlichen Versandtermine werden auf der Bestellseite angegeben; jedoch kann es aufgrund von produktionsbedingten Problemen zu Verzögerungen beim tatsächlichen Versand kommen.
Unser Versandverfahren erfolgt nach dem Prinzip “Wer zuerst bezahlt, wird zuerst beliefert”. Sobald die vollständige Zahlung eingegangen ist, bemühen wir uns, den Versand so schnell wie möglich zu veranlassen. Zahlungen per Banküberweisung (T/T) können 3–7 Werktage zur Überprüfung benötigen, während Zahlungen per Kryptowährung in der Regel innerhalb weniger Stunden bis zu einem Werktag bestätigt werden.
Der internationale Versand dauert in der Regel 5–8 Werktage; in abgelegenen Regionen kann sich die Lieferzeit auf 8–10 Werktage verlängern.
*Alle Transaktionen gelten als endgültige Verkäufe und sind nach Abschluss nicht mehr erstattungsfähig. Wir bitten um Ihr Verständnis, dass dies branchenüblich ist.
Rezensionen
Filter löschenEs gibt noch keine Rezensionen.