BITMAIN ANTSPACE HW7 2MW Hydro Mining Container
Deploy up to 396 standard hydro miners or 242 2U ASIC miners with the BITMAIN ANTSPACE HW7 2MW hydro-cooling container. Get project pricing and deployment support from PunkHash.
$109,000.00
طريقة الدفع
نظرًا للتغيرات السريعة التي يشهدها السوق، قد تتقلب أسعار آلات التعدين؛ لذا يرجى التأكد من أحدث الأسعار مع فريق المبيعات لدينا قبل إجراء الدفع لتجنب الخسائر المالية.
وفر في تكاليف الشحن عند طلب جهازين أو أكثر! اتصل بفريق المبيعات لدينا اليوم للحصول على أفضل عرض أسعار.
الوصف:
BITMAIN ANTSPACE HW7 2MW Hydro Mining Container
Next-Generation Hydro Infrastructure for High-Density Bitcoin Mining
The BITMAIN ANTSPACE HW7 is a next-generation 2MW hydro-cooling mining container developed for large-scale, high-density Bitcoin mining operations.
Its flexible internal layout supports up to 396 standard T-type hydro-cooled mining servers or up to 242 rack-mounted 2U hydro miners, including the Antminer S23e U2H.
By combining modular power distribution, coolant circulation, dry-tower cooling and evaporative cooling assistance, the HW7 provides a standardized infrastructure platform for mining companies, hosting operators, energy developers and institutional mining projects.
[Request Project Pricing] [Talk to an Infrastructure Advisor]
Two Miner Formats. One Scalable Platform.
Unlike conventional mining containers built around only one miner form factor, the ANTSPACE HW7 supports two high-density deployment configurations:
- Up to 396 standard T-type hydro miners
- Up to 242 rack-mounted 2U hydro miners
This allows project owners to select equipment according to power density, hashrate targets, hardware availability and future fleet-upgrade plans.
Final capacity depends on the exact miner model, individual power consumption, coolant requirements and the approved electrical configuration.
الميزات الرئيسية
- 2,000kW hydro-cooling capacity
- Up to 396 standard hydro miners
- Up to 242 rack-mounted 2U hydro miners
- Compatible with Antminer S23e U2H configurations
- Approximately 1.031 PUE under specified conditions
- Dry tower with evaporative cooling assistance
- Modular 40-foot container design
- 380–480V wide-voltage input
- 50/60Hz grid compatibility
- Designed for high-density SHA-256 mining
- Supports phased mining-farm expansion
- Suitable for international industrial deployment
- North American and CE certification options
Higher Mining Density
The ANTSPACE HW7 is designed to help mining operators deploy more hashrate within a standardized container footprint.
With capacity for up to 396 conventional hydro miners or 242 high-density 2U units, the HW7 can support large-scale fleet deployment while simplifying power distribution, coolant circulation and equipment management.
When configured with 242 Antminer S23e U2H 865TH/s miners, the theoretical installed hashrate could exceed 209PH/s before accounting for actual operating availability, miner tolerance and site-level limitations.
Actual deployed hashrate must be calculated using the final miner configuration.
Designed for 2U Hydro Mining
The arrival of high-density miners such as the Antminer S23e U2H changes how mining infrastructure must be designed.
A single S23e U2H provides 865TH/s while drawing approximately 8,650W. Deploying hundreds of these machines requires careful coordination between:
- Rack density
- Power distribution
- Coolant flow
- Heat rejection
- Transformer capacity
- Network infrastructure
- Maintenance access
- Safety systems
The ANTSPACE HW7 is designed to support this new generation of rack-mounted hydro miners while remaining compatible with standard T-type configurations.
Hybrid Dry and Evaporative Cooling
The HW7 uses a dry-cooling tower supported by an evaporative cooling pad.
Under moderate conditions, the dry-cooling system rejects heat without depending entirely on continuous water consumption. During higher-temperature periods, evaporative assistance can improve heat rejection and system stability.
This combined approach expands the range of climates in which the container can operate.
Actual cooling capacity and water consumption will depend on:
- Ambient temperature
- Relative humidity
- Site altitude
- Coolant supply temperature
- Installed miner load
- Cooling-tower configuration
- Water quality
- Maintenance condition
A site-specific thermal analysis is required before installation, especially in very hot or humid regions.
Energy-Efficient Supporting Infrastructure
BITMAIN specifies a PUE of approximately 1.031 under conditions including:
- 25°C ambient temperature
- 35°C coolant supply temperature
A PUE of 1.031 means that the supporting infrastructure uses approximately 3.1% of the miners’ IT load under the stated test conditions.
Actual site PUE will vary depending on temperature, miner load, pump speed, cooling demand, transformer losses and other site equipment.
PUE should therefore be treated as a reference under specified conditions, not a guaranteed annual site result.
Main Specifications
| المواصفات | ANTSPACE HW7 |
|---|---|
| الشركة المصنعة | BITMAIN |
| Product Model | ANTSPACE HW7 |
| Solution Type | Hydro-cooling mining container |
| Container Format | 40-foot modular container |
| Cooling Capacity | 2,000kW |
| Standard Miner Capacity | Up to 396 T-type hydro miners |
| 2U Miner Capacity | Up to 242 rack-mounted 2U miners |
| Example 2U Model | Antminer S23e U2H |
| Cooling System | Dry tower with evaporative cooling assistance |
| Reference PUE | Approximately 1.031 |
| PUE Test Condition | 25°C ambient / 35°C supply liquid |
| جهد الدخل | 380–480V |
| Grid Frequency | 50/60Hz |
| Primary Application | Industrial SHA-256 mining |
| Deployment Type | Modular mining farm and hosting infrastructure |
| Certification | North American and CE options |
All specifications must be confirmed against the final BITMAIN technical documentation and selected project configuration before purchase.
Suitable Applications
Large-Scale Bitcoin Mining
Deploy a high concentration of SHA-256 hashrate within a standardized modular system.
2U Mining Server Projects
Build infrastructure around high-density miners such as the Antminer S23e U2H.
Mining Hosting Facilities
Provide standardized hydro-cooled capacity for institutional or third-party mining customers.
Existing Mining-Site Expansion
Add a 2MW hydro module to sites with sufficient transformer, grid and civil infrastructure.
Power Monetization Projects
Convert available industrial power into deployable computing capacity, subject to utility, grid and project requirements.
Phased Mining-Farm Development
Start with one container and add additional HW7 modules as power and capital become available.
Site Requirements
Before ordering the ANTSPACE HW7, customers should confirm:
- Available utility capacity
- Transformer capacity and voltage
- 380–480V three-phase electrical system
- Medium-voltage and low-voltage distribution
- Grounding and electrical protection
- Site foundation and load-bearing capacity
- Dry-cooling tower installation area
- Ambient temperature and humidity
- Water availability and water quality
- Coolant and piping configuration
- Stable network connectivity
- Crane and unloading access
- Local permits and certifications
- Installation and commissioning responsibilities
- Maintenance and spare-parts plan
The ANTSPACE HW7 is a major mining-infrastructure component, but it should not be presented as a complete mining site.
Transformers, medium-voltage equipment, cabling, foundations, network systems, civil construction, installation and commissioning may need to be supplied separately.
HW7 or HD5: Which One Should You Choose?
| Feature | ANTSPACE HW7 | ANTSPACE HD5 |
|---|---|---|
| Cooling Capacity | 2,000kW | Approximately 1,500kW |
| Standard Miner Capacity | Up to 396 | Up to 308 |
| 2U Miner Support | Up to 242 units | Not the primary configuration |
| Cooling Technology | Dry tower plus evaporative assistance | Dry-cooling tower |
| Target Deployment | Higher-density and next-generation fleets | Standard hydro fleet deployment |
| Best Fit | S23e U2H and mixed-format projects | S19/S21/S23 standard hydro miners |
Choose the HW7 when the project requires higher density, 2U miner compatibility or broader environmental adaptability.
Choose the HD5 when the project is based mainly on standard hydro miners and approximately 1.5MW modules are more suitable for the site.
Professional Project Support from PunkHash
PunkHash can assist with more than ANTSPACE sourcing.
Our team can support:
- ANTSPACE HW7 procurement
- Antminer S23e U2H and hydro-miner sourcing
- Container and miner capacity planning
- Transformer and power-equipment matching
- International logistics
- Site deployment coordination
- Cooling and electrical requirement review
- Mining ROI scenario analysis
- Installation-resource coordination
- After-sales support
Share your site location, electricity price, available power, preferred miner model and deployment schedule. We will help you evaluate the complete project configuration.
الأسئلة الشائعة
How many miners can the ANTSPACE HW7 hold?
It supports up to 396 standard T-type hydro miners or up to 242 rack-mounted 2U hydro miners.
Does the HW7 support the Antminer S23e U2H?
Yes. BITMAIN specifically identifies the S23e U2H as a compatible 2U miner configuration.
Does the HW7 include the cooling tower?
The HW7 solution is designed to operate with a dry tower and evaporative cooling pad. The final quotation must clearly state which cooling equipment, pipes, cables and accessories are included.
Is the transformer included?
A transformer should not be assumed to be included unless specifically stated in the quotation.
What transformer capacity is required?
Transformer selection depends on the miner configuration, number of containers, maximum system load, redundancy plan and local electrical standards. A qualified electrical engineer should approve the final design.
Is the PUE always 1.031?
No. The stated PUE is measured under specified conditions. Actual annual PUE changes with climate, miner load and supporting infrastructure.
Can it operate in hot climates?
The combined dry and evaporative cooling design improves high-temperature adaptability, but every project requires a site-specific thermal assessment.
Can PunkHash supply the miners and container together?
Yes. PunkHash can prepare an integrated proposal covering the HW7, compatible miners, transformers, power equipment, logistics and deployment requirements.
Request an ANTSPACE HW7 Project Quote
For an accurate proposal, please provide:
- Project country and site location
- Available power capacity
- Site input voltage
- Electricity price
- Preferred miner model
- Standard or 2U miner configuration
- Number of HW7 containers
- Target deployment date
- Transformer availability
- Required logistics scope
- Installation and commissioning requirements
PunkHash — Compute the Future, Together.
حول وسائل النقل:سيتم شحن أجهزة التعدين المتوفرة في المخزون في غضون 3 أيام عمل. أما بالنسبة للطلبات بالجملة التي يتم شحنها عبر DHL Express أو UPS أو FedEx أو TNT، فيرجى الانتظار لمدة يوم إلى يومين إضافيين لإتمام إجراءات الشحن.
تعتمد مواعيد تسليم أجهزة التعدين التي تم طلبها مسبقًا على الجدول الزمني للإنتاج في المصنع. وتُعرض تواريخ الشحن التقديرية في صفحة الطلب؛ ومع ذلك، قد تتأخر عمليات الشحن الفعلية بسبب مشكلات متعلقة بالإنتاج.
تعمل عملية الشحن لدينا وفق مبدأ “من يدفع أولاً، يُشحن أولاً”. وبمجرد استلام المبلغ بالكامل، سنبذل قصارى جهدنا لترتيب الشحن في أسرع وقت ممكن. قد تستغرق عمليات التحقق من المدفوعات التي تتم عبر التحويل المصرفي (T/T) من 3 إلى 7 أيام عمل، بينما يتم تأكيد المدفوعات التي تتم عبر العملات المشفرة عادةً في غضون بضع ساعات إلى يوم عمل واحد.
يستغرق الشحن الدولي عادةً من 5 إلى 8 أيام عمل؛ أما بالنسبة للمناطق النائية، فقد تمتد مدة الشحن إلى 8–10 أيام عمل.
*تُعتبر جميع المعاملات مبيعات نهائية ولا يمكن استرداد قيمتها بمجرد إتمامها. ونقدر تفهمكم بأن هذه ممارسة معتادة في هذا القطاع.
