BITMAIN Antminer S21e XP Hyd 430T Bitcoin Miner

The BITMAIN Antminer S21e XP Hyd delivers 430 TH/s at 5590W with an energy efficiency of 13 J/TH. Designed for professional hydro-cooled mining farms, it combines high-density SHA-256 computing, stable thermal performance and efficient 24/7 operation.

$3,899.00

Способ оплаты

1487a2a7-2d12-464b-a0aa-6a3c23b13eac — преобразовано из PNG

Учитывая быстро меняющуюся рыночную конъюнктуру, цены на горнодобывающую технику могут колебаться; пожалуйста, перед осуществлением оплаты уточните актуальную цену у нашего отдела продаж, чтобы избежать финансовых потерь.

Сэкономьте на доставке, заказав две или более машины! Свяжитесь с нашим отделом продаж уже сегодня, чтобы получить выгодное ценовое предложение.

Описание:

BITMAIN Antminer S21e XP Hyd 430T Bitcoin Miner

430 TH/s Hydro-Cooled SHA-256 Mining at 13 J/TH

The BITMAIN Antminer S21e XP Hyd 430T is a high-performance hydro-cooled ASIC miner developed for professional Bitcoin mining farms and large-scale SHA-256 computing infrastructure.

Delivering 430 TH/s of hashrate with a rated power consumption of 5590W, the S21e XP Hyd achieves an energy efficiency of approximately 13 J/TH.

Its compact hydro-cooled architecture transfers heat into an external liquid circuit, supporting stable operating temperatures and high-density deployment without relying on conventional high-speed cooling fans.

Основные особенности

  • 430 TH/s rated hashrate
  • 5590W rated power consumption
  • 13 J/TH energy efficiency
  • SHA-256 mining algorithm
  • Hydro-cooled thermal architecture
  • 380–415V industrial power input
  • Ethernet network connection
  • Approximately 50dB machine noise
  • Suitable for continuous industrial operation
  • Compatible with professional hydro mining infrastructure

Технические характеристики

Технические характеристики Value
Производитель BITMAIN
Модель Antminer S21e XP Hyd
Хешрейт 430 TH/s
Потребляемая мощность 5590W
Energy Efficiency 13 J/TH
Алгоритм SHA-256
Primary Coin Bitcoin
Other Compatible Coins BCH, BSV and other SHA-256 coins
Способ охлаждения Гидроохлаждение
Входное напряжение 380–415 В
Input Frequency 50–60 Гц
Input Phase Three-Phase
Maximum Input Current Approximately 12A
Network Connection RJ45 Ethernet
Miner Dimensions Approximately 410 × 170 × 209mm
Reference Net Weight Approximately 13.8kg
Reference Noise Level Approximately 50dB
Рабочая температура Approximately 20–50°C
Relative Humidity 10%–90%

Specifications may vary by production batch. The machine nameplate, order confirmation and BITMAIN documentation should be used for final electrical and infrastructure planning.

Efficient Hydro-Cooled Bitcoin Mining

At approximately 13 J/TH, the S21e XP Hyd provides a competitive balance between acquisition cost, power efficiency and total computing output.

Compared with older hydro miners, it can help mining operators:

  • Increase hashrate within the same electrical capacity
  • Reduce power consumption per terahash
  • Improve mining fleet efficiency
  • Replace older S19 Hydro equipment
  • Deploy more computing power within a limited space
  • Maintain stable operating temperatures under continuous load

Actual mining returns depend on electricity price, network difficulty, Bitcoin price, pool fees, uptime and infrastructure expenses.

Hydro-Cooling Infrastructure

The Antminer S21e XP Hyd requires an external closed-loop hydro-cooling system and cannot operate like a conventional standalone air-cooled miner.

A complete installation normally requires:

  • Compatible hydro mining container or cooling cabinet
  • Circulation pumps
  • Heat exchanger, dry cooler or cooling tower
  • Coolant filtration and water treatment
  • Compatible piping and connectors
  • Suitable transformer and power distribution
  • Network and monitoring systems

Cooling capacity should be calculated using the total thermal load of all installed miners, with additional engineering headroom for pumps, ambient temperature and operating conditions.

Electrical Requirements

The S21e XP Hyd requires a 380–415V industrial electrical supply. It is not designed for connection to a standard household outlet.

Before deployment, customers should verify:

  • Transformer capacity
  • Three-phase voltage and frequency
  • Circuit-breaker ratings
  • PDU and connector compatibility
  • Cable size and protection
  • Cooling-system capacity
  • Available network infrastructure

All electrical installation work should be completed or reviewed by qualified professionals.

Suitable Applications

  • Professional Bitcoin mining farms
  • New hydro-cooled mining projects
  • Replacement of S19 Hydro fleets
  • ANTSPACE and compatible container deployment
  • High-density SHA-256 mining infrastructure
  • Mining farms with limited available power
  • Fleet efficiency and capacity upgrades

Why Buy from PunkHash?

  • Hong Kong and international supply channels
  • Pre-shipment visual and operating inspection
  • Hashrate and machine-status verification
  • Serial-number verification when available
  • Miner and hydro-container compatibility support
  • International logistics coordination
  • Bulk-order and project pricing
  • Mining containers, transformers and power equipment
  • Complete mining infrastructure consultation

Часто задаваемые вопросы

What is the hashrate of the S21e XP Hyd?

The rated hashrate is 430 TH/s. Actual hashrate may vary according to the manufacturer’s tolerance, firmware and operating conditions.

How much electricity does it consume?

Rated power consumption is approximately 5590W, equivalent to around 134.16kWh per day when operating continuously for 24 hours.

What is its energy efficiency?

The rated energy efficiency is approximately 13 J/TH.

Can it operate without an external hydro-cooling system?

No. It requires an external cooling loop with coolant circulation and heat-dissipation equipment.

Can it operate on residential electricity?

No. It is designed for industrial power infrastructure and normally requires a 380–415V supply.

Is the cooling container included?

No. Unless specifically included in the quotation, the miner price does not include a hydro container, cooling tower, transformer, piping or installation service.

Request a Quotation

Contact PunkHash for current availability, batch information, bulk pricing, international freight and complete hydro-mining deployment support.

Compute the Future, Together.

О транспорте:Майнеры, имеющиеся в наличии, будут отправлены в течение 3 рабочих дней. В случае оптовых заказов, отправляемых через DHL Express, UPS, FedEx или TNT, на обработку заказа может уйти дополнительно 1–2 дня.
Сроки доставки майнеров, заказанных в рамках предварительного заказа, зависят от производственного графика завода. Ориентировочные даты отправки указаны на странице заказа; однако фактическая отправка может задержаться из-за проблем, связанных с производством.
Наша процедура отправки товаров осуществляется по принципу “кто первый оплатил, тому первым отправляем”. После получения полной оплаты мы постараемся организовать отправку как можно быстрее. Проверка платежей, произведённых банковским переводом (T/T), может занять 3–7 рабочих дней, тогда как платежи, произведённые с помощью криптовалюты, обычно подтверждаются в течение от нескольких часов до 1 рабочего дня.
Международная доставка обычно занимает 5–8 рабочих дней; в отдалённые регионы срок доставки может увеличиваться до 8–10 рабочих дней.
*Все сделки являются окончательными и не подлежат возврату после их завершения. Мы благодарим вас за понимание того, что это является стандартной практикой в данной отрасли.

Покупатели, которые просматривали этот товар, также просматривали