Antminer S21 Pro 234 TH/s Bitcoin Miner

Antminer S21 Pro: 234 TH/s reference hashrate, 3,510W reference power and air cooling for SHA-256 mining. Confirm the exact configuration and send quantity and destination for quotation.

$1,830.00

9999 в наличии

Способ оплаты

1487a2a7-2d12-464b-a0aa-6a3c23b13eac — преобразовано из PNG

Учитывая быстро меняющуюся рыночную конъюнктуру, цены на горнодобывающую технику могут колебаться; пожалуйста, перед осуществлением оплаты уточните актуальную цену у нашего отдела продаж, чтобы избежать финансовых потерь.

Сэкономьте на доставке, заказав две или более машины! Свяжитесь с нашим отделом продаж уже сегодня, чтобы получить выгодное ценовое предложение.

Описание:

Antminer S21 Pro: specifications and deployment guide

The Antminer S21 Pro is an air-cooled mining machine for SHA-256 workloads, with a reference hashrate of 234 TH/s and reference power consumption of 3,510W. It is listed for Bitcoin mining. Match the exact hardware version, power specification and pool requirements before deployment.

Antminer S21 Pro technical overview

Бренд Bitmain
Модель Antminer S21 Pro
Mining workload SHA-256
Reference hashrate 234 TH/s
Reference power 3,510W
Охлаждение Воздух
Network / coins BTC
Calculated 24-hour energy use 84.240 kWh, excluding facility overhead

Supplier listings may use S21 Pro or Pro+ naming. Confirm the original factory label and selected hashrate bin. This page uses the 234 TH/s, 3510W reference configuration.

Plan a reliable Antminer S21 Pro installation

The air-cooled layout requires a suitable electrical circuit and a clear intake-to-exhaust airflow path. At the reference power of 3,510W, plan both ventilation and heat removal for the full installed load. A compact enclosure does not establish suitability for a bedroom, shared office or living room; confirm the manufacturer noise specification and the actual installation environment.

Antminer S21 Pro electricity planning

At a constant 3,510W for 24 hours, calculated energy use is 84.240 kWh per day. At USD 0.05/kWh, that corresponds to approximately USD 4.21 per day for the miner alone. At USD 0.08/kWh, that corresponds to approximately USD 6.74 per day for the miner alone. At USD 0.10/kWh, that corresponds to approximately USD 8.42 per day for the miner alone. These are arithmetic planning examples, not measured consumption, mining revenue or a profit forecast. Operating mode, ambient conditions and supporting equipment can change actual site consumption.

Frequently asked questions

Which network is this machine intended to mine?

The listed workload is SHA-256, with BTC as the reference network or coin selection. ASIC mining hardware is designed for its supported algorithm. It does not become a Bitcoin miner or a general-purpose AI computer simply by changing the pool address. For merged mining, check the pool’s current supported networks and payout rules.

What must be checked before ordering the Antminer S21 Pro?

Confirm the exact model and hashrate bin, input voltage and phase, plug or PDU connection, operating mode, condition and included accessories. Ask for the specifications applicable to the quoted batch. New, used and modified equipment can carry different delivery and warranty terms.

Does the listed hashrate guarantee daily income?

No. Mining output varies with pool performance, network difficulty, fees and uptime. Coin prices and electricity costs also change the operating result. Use current network data and your complete site costs when evaluating a deployment; a static product page cannot guarantee payback or daily profit.

How do I request a quotation from PunkHash?

Send the model, requested hashrate, quantity and destination country. Include your supply voltage and cooling configuration for a farm project. PunkHash can then confirm the quoted hardware version, available condition, shipment plan, included components and applicable warranty before payment.

Prepare the complete mining setup

Keep a record of the miner specification, power connections, cooling arrangement and maintenance requirements for each installation. For multiple machines, calculate the combined electrical load and heat rejection requirement rather than repeating a single-unit assumption across the site.

Send model, quantity and destination for quotation. Review mining accessories and power connections when planning related spare parts.

Antminer S21 Pro model identification

The manufacturer identifies this 234 TH/s reference configuration as S21 Pro. Some commercial offers use a Pro+ label; confirm the actual nameplate and hardware revision instead of treating the additional symbol as proof of a different specification.

Antminer S21 Pro: configuration and ordering

Confirm the hardware version, operating profile, electrical connections and included items for the quoted batch. The reference photograph identifies the product family and does not establish the exact accessories included in every order. Send model, quantity and destination to PunkHash for a matched quotation.

Compare the manufacturer or supplier product reference when identifying the required configuration.

Antminer S21 Pro - PunkHash
Reference appearance. Confirm selected version and package contents.

О транспорте:Майнеры, имеющиеся в наличии, будут отправлены в течение 3 рабочих дней. В случае оптовых заказов, отправляемых через DHL Express, UPS, FedEx или TNT, на обработку заказа может уйти дополнительно 1–2 дня.
Сроки доставки майнеров, заказанных в рамках предварительного заказа, зависят от производственного графика завода. Ориентировочные даты отправки указаны на странице заказа; однако фактическая отправка может задержаться из-за проблем, связанных с производством.
Наша процедура отправки товаров осуществляется по принципу “кто первый оплатил, тому первым отправляем”. После получения полной оплаты мы постараемся организовать отправку как можно быстрее. Проверка платежей, произведённых банковским переводом (T/T), может занять 3–7 рабочих дней, тогда как платежи, произведённые с помощью криптовалюты, обычно подтверждаются в течение от нескольких часов до 1 рабочего дня.
Международная доставка обычно занимает 5–8 рабочих дней; в отдалённые регионы срок доставки может увеличиваться до 8–10 рабочих дней.
*Все сделки являются окончательными и не подлежат возврату после их завершения. Мы благодарим вас за понимание того, что это является стандартной практикой в данной отрасли.

Покупатели, которые просматривали этот товар, также просматривали