Lian Li 12kW water cooling radiator – Loop Selection
Lian Li 12kW water cooling radiator. An integrated pump and radiator assembly for a matched ASIC liquid cooling loop, with temperature-based fan control and a 220V supply. Entry option price; confirm size and scope.
$349.00
9999 in stock
Payment Method
Given the rapidly changing market, mining machine prices may fluctuate; please confirm the latest price with our sales team before making payment to avoid financial losses.
Save on shipping costs when you order two or more machines! Contact our sales team today to get the best quote.
Description:
Lian Li 12kW water cooling radiator: An integrated pump and radiator assembly for a matched ASIC liquid cooling loop, with temperature-based fan control and a 220V supply. PunkHash helps buyers define the part and installation scope before combining it with the rest of a mining cooling circuit.
Lian Li 12kW water cooling radiator: selection details
| Nominal cooling class | 12kW; usable capacity depends on ambient temperature and loop conditions |
|---|---|
| Electrical connection | 220V; C14 inlet requires a suitable C13 cord |
| Dimensions and net weight | 750 × 220 × 580mm; 21kg |
| Listed coolant volume and flow | Approximately 8L; listed flow 11L/min |
| Connection selection | 10mm or 12mm connection kit, matched to the miner manifold |
The source distinguishes 10mm and 12mm kit options. Confirm the exact upgraded version, connector kit and power cord in the order. A two-miner example is conditional on the combined heat load and ambient temperature; miner count or hashrate alone is insufficient for system sizing.
Size the radiator for the site
Use actual electrical heat load, maximum outdoor temperature and allowable miner inlet temperature for selection. Keep space for radiator airflow and maintenance access. Pump head, pressure limits, pipe dimensions and coolant compatibility must match the miner circuit. A nominal kilowatt class is a product description; it does not guarantee that the same capacity is available in every climate or installation.
Related electronics and service parts
Compare replacement control boards by controller revision and firmware. Check mining power supplies against the miner voltage, output and communication interface. These catalogs are matching resources; a cooling accessory does not establish electronic compatibility.
Buyer questions about the Lian Li 12kW water cooling radiator
What information is needed for a matched quote?
Send the exact miner model, board or part revision, clear connection photographs, quantity and delivery country. For a radiator or pump, include the intended loop arrangement and operating heat load. Confirm the selected configuration, supplied accessories and selling unit in the itemized quotation.
How should the installation location affect selection?
Share the summer ambient temperature and available electrical supply. Sites in the UAE or Texas should evaluate heat rejection at their hottest expected conditions. In colder locations, discuss freeze protection and start-up conditions with the system designer. Shipping cost and delivery time depend on destination and the confirmed order.
Request a matched Lian Li 12kW water cooling radiator quotation from PunkHash. We can review the proposed component combination before you place the order.

About transportation:In-stock miners will be shipped within 3 business days. For bulk orders shipped via DHL Express, UPS, FedEx, or TNT, please allow an additional 1–2 days for processing.
Delivery times for pre-order miners depend on the factory’s production schedule. Estimated shipping dates are provided on the order page; however, actual shipments may be subject to delays due to production-related issues.
Our shipping process operates on a “first-pay, first-ship” basis. Once full payment has been received, we will strive to arrange shipment as quickly as possible. Payments made via bank wire transfer (T/T) may take 3–7 business days to verify, whereas payments made via cryptocurrency are typically confirmed within a few hours to 1 business day.
International shipping typically takes 5–8 business days; for remote regions, transit times may extend to 8–10 business days.
*All transactions constitute final sales and are non-refundable once completed. We appreciate your understanding that this is standard practice within the industry.
Reviews
Clear filtersThere are no reviews yet.