Elphapex DG1+ 13–14.4 GH/s LTC & DOGE Miner
Elphapex DG1+: 13–14.4 GH/s reference hashrate, 3,950W reference power and air cooling for Scrypt mining. Confirm the exact configuration and send quantity and destination for quotation.
$1,450.00
9999 in stock
Payment Method
Given the rapidly changing market, mining machine prices may fluctuate; please confirm the latest price with our sales team before making payment to avoid financial losses.
Save on shipping costs when you order two or more machines! Contact our sales team today to get the best quote.
Description:
Elphapex DG1+: specifications and deployment guide
The Elphapex DG1+ is a air-cooled mining machine for Scrypt workloads, with a reference hashrate of 13–14.4 GH/s and reference power consumption of 3,950W. It is listed for LTC & DOGE mining. Match the exact hardware version, power specification and pool requirements before deployment.
Elphapex DG1+ technical overview
| Brand | Elphapex |
|---|---|
| Model | DG1+ |
| Mining workload | Scrypt |
| Reference hashrate | 13–14.4 GH/s |
| Reference power | 3,950W |
| Cooling | Air |
| Network / coins | LTC / DOGE |
| Calculated 24-hour energy use | 94.800 kWh, excluding facility overhead |
DG1+ listings cover multiple hashrate bins. Confirm whether the quotation is for 13, 14 or 14.4 GH/s, together with the corresponding rated power and condition. The displayed starting price does not identify every bin.
Plan a reliable Elphapex DG1+ installation
The air-cooled layout requires a suitable electrical circuit and a clear intake-to-exhaust airflow path. At the reference power of 3,950W, plan both ventilation and heat removal for the full installed load. A compact enclosure does not establish suitability for a bedroom, shared office or living room; confirm the manufacturer noise specification and the actual installation environment.
Elphapex DG1+ electricity planning
At a constant 3,950W for 24 hours, calculated energy use is 94.800 kWh per day. At USD 0.05/kWh, that corresponds to approximately USD 4.74 per day for the miner alone. At USD 0.08/kWh, that corresponds to approximately USD 7.58 per day for the miner alone. At USD 0.10/kWh, that corresponds to approximately USD 9.48 per day for the miner alone. These are arithmetic planning examples, not measured consumption, mining revenue or a profit forecast. Operating mode, ambient conditions and supporting equipment can change actual site consumption.
Frequently asked questions
Which network is this machine intended to mine?
The listed workload is Scrypt, with LTC / DOGE as the reference network or coin selection. ASIC mining hardware is designed for its supported algorithm. It does not become a Bitcoin miner or a general-purpose AI computer simply by changing the pool address. For merged mining, check the pool’s current supported networks and payout rules.
What must be checked before ordering the Elphapex DG1+?
Confirm the exact model and hashrate bin, input voltage and phase, plug or PDU connection, operating mode, condition and included accessories. Ask for the specifications applicable to the quoted batch. New, used and modified equipment can carry different delivery and warranty terms.
Does the listed hashrate guarantee daily income?
No. Mining output varies with pool performance, network difficulty, fees and uptime. Coin prices and electricity costs also change the operating result. Use current network data and your complete site costs when evaluating a deployment; a static product page cannot guarantee payback or daily profit.
How do I request a quotation from PunkHash?
Send the model, requested hashrate, quantity and destination country. Include your supply voltage and cooling configuration for a farm project. PunkHash can then confirm the quoted hardware version, available condition, shipment plan, included components and applicable warranty before payment.
Prepare the complete mining setup
Keep a record of the miner specification, power connections, cooling arrangement and maintenance requirements for each installation. For multiple machines, calculate the combined electrical load and heat rejection requirement rather than repeating a single-unit assumption across the site.
Send model, quantity and destination for quotation. Review mining accessories and power connections when planning related spare parts.

About transportation:In-stock miners will be shipped within 3 business days. For bulk orders shipped via DHL Express, UPS, FedEx, or TNT, please allow an additional 1–2 days for processing.
Delivery times for pre-order miners depend on the factory’s production schedule. Estimated shipping dates are provided on the order page; however, actual shipments may be subject to delays due to production-related issues.
Our shipping process operates on a “first-pay, first-ship” basis. Once full payment has been received, we will strive to arrange shipment as quickly as possible. Payments made via bank wire transfer (T/T) may take 3–7 business days to verify, whereas payments made via cryptocurrency are typically confirmed within a few hours to 1 business day.
International shipping typically takes 5–8 business days; for remote regions, transit times may extend to 8–10 business days.
*All transactions constitute final sales and are non-refundable once completed. We appreciate your understanding that this is standard practice within the industry.
Customers who viewed it also viewed
Antminer HHB42701 1U Hydro Bitcoin Miner – 49.75 TH/s, Single-Phase Power
In stock