{"id":13314,"date":"2026-09-15T00:18:50","date_gmt":"2026-09-15T08:18:50","guid":{"rendered":"https:\/\/www.punkhash.com\/?post_type=product&#038;p=13314"},"modified":"2026-09-19T22:38:36","modified_gmt":"2026-09-20T06:38:36","slug":"bitmain-antspace-hd5-1-5mw-hydro-mining-container","status":"publish","type":"product","link":"https:\/\/www.punkhash.com\/ru\/product\/bitmain-antspace-hd5-1-5mw-hydro-mining-container\/","title":{"rendered":"BITMAIN ANTSPACE HD5 1.5MW Hydro Mining Container"},"content":{"rendered":"<h1>BITMAIN ANTSPACE HD5 1.5MW Hydro Mining Container<\/h1>\n<h2>High-Density Infrastructure for Up to 308 Hydro ASIC Miners<\/h2>\n<p>The BITMAIN ANTSPACE HD5 is a modular, industrial-scale hydro-cooling mining container designed for high-density Bitcoin mining deployments.<\/p>\n<p>It provides up to 308 rack spaces for compatible Antminer Hydro models, including selected S19 Hyd, S21 Hyd and S23 Hyd series miners. Combined with an external dry-cooling tower, the HD5 offers an integrated approach to power distribution, coolant circulation and large-scale heat rejection.<\/p>\n<p>With approximately 1.5MW of normal operating capacity, the ANTSPACE HD5 is suitable for mining companies, hosting operators, energy developers and investors building scalable hydro-cooled mining facilities.<\/p>\n<p>[Request HD5 Pricing] [Discuss Your Mining Project]<\/p>\n<hr \/>\n<h2>Key Features<\/h2>\n<ul>\n<li>Capacity for up to 308 compatible hydro-cooled ASIC miners<\/li>\n<li>Approximately 1,512kW normal operating power<\/li>\n<li>Up to approximately 1,765kW maximum power<\/li>\n<li>Integrated power distribution and coolant circulation<\/li>\n<li>External 1,500kW dry-cooling tower<\/li>\n<li>Compatible with selected Antminer S19, S21 and S23 Hydro series<\/li>\n<li>Modular 40-foot container format<\/li>\n<li>Designed for rapid industrial deployment<\/li>\n<li>Supports phased mining-site expansion<\/li>\n<li>Suitable for dry or water-restricted regions<\/li>\n<li>400V \u00b15%, 50\/60Hz electrical input<\/li>\n<li>Industrial safety and container certification options<\/li>\n<\/ul>\n<hr \/>\n<h2>Deploy More Hashrate in a Standardized Footprint<\/h2>\n<p>Building a hydro-cooled mining facility requires more than installing miners inside a container.<\/p>\n<p>The electrical distribution, coolant flow, heat exchanger, pumps, piping, control system and external heat-rejection equipment must operate as one coordinated system.<\/p>\n<p>The ANTSPACE HD5 brings these core components into a standardized modular design, helping project owners reduce on-site construction complexity and deploy large quantities of hydro miners more efficiently.<\/p>\n<p>Instead of developing every cooling and power component separately, customers can use the HD5 as a repeatable infrastructure unit for phased mining-site expansion.<\/p>\n<hr \/>\n<h2>Designed for High-Density Hydro Mining<\/h2>\n<p>The HD5 supports up to 308 compatible hydro ASIC miners inside one containerized system.<\/p>\n<p>This makes it suitable for deploying high-density Bitcoin mining hardware such as selected:<\/p>\n<ul>\n<li>Antminer S19 Hydro series<\/li>\n<li>Antminer S21 Hydro series<\/li>\n<li>Antminer S23 Hydro series<\/li>\n<\/ul>\n<p>Final compatibility must be confirmed according to the exact miner model, power consumption, dimensions, connector type, voltage and required coolant flow.<\/p>\n<hr \/>\n<h2>Integrated Dry-Cooling Solution<\/h2>\n<p>The ANTSPACE HD5 uses a closed-loop hydro-cooling architecture connected to an external dry-cooling tower.<\/p>\n<p>Heat generated by the ASIC miners is transferred into the coolant circuit and then rejected through the dry cooler. This design can reduce dependence on evaporative cooling and may be valuable in locations where water availability is limited.<\/p>\n<p>The dry-cooling tower provides approximately 1,500kW of heat-dissipation capacity under specified operating conditions.<\/p>\n<p>Actual cooling performance depends on:<\/p>\n<ul>\n<li>Ambient temperature<\/li>\n<li>Coolant temperature<\/li>\n<li>Miner heat load<\/li>\n<li>System flow rate<\/li>\n<li>Site altitude<\/li>\n<li>Dry-cooler configuration<\/li>\n<li>Maintenance condition<\/li>\n<\/ul>\n<p>A complete thermal assessment should be performed before deployment, especially in high-temperature regions.<\/p>\n<hr \/>\n<h2>Main Specifications<\/h2>\n<table>\n<thead>\n<tr>\n<th>Specification<\/th>\n<th>ANTSPACE HD5<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td>Product Model<\/td>\n<td>BITMAIN ANTSPACE HD5<\/td>\n<\/tr>\n<tr>\n<td>Solution Type<\/td>\n<td>Hydro-cooling mining container<\/td>\n<\/tr>\n<tr>\n<td>Container Format<\/td>\n<td>40-foot modular container<\/td>\n<\/tr>\n<tr>\n<td>Miner Capacity<\/td>\n<td>Up to 308 units<\/td>\n<\/tr>\n<tr>\n<td>Compatible Miners<\/td>\n<td>Selected Antminer S19\/S21\/S23 Hydro models<\/td>\n<\/tr>\n<tr>\n<td>Normal Operating Power<\/td>\n<td>Approximately 1,512kW<\/td>\n<\/tr>\n<tr>\n<td>Maximum Power<\/td>\n<td>Approximately 1,765kW<\/td>\n<\/tr>\n<tr>\n<td>Input Voltage<\/td>\n<td>400V \u00b15%<\/td>\n<\/tr>\n<tr>\n<td>Input Frequency<\/td>\n<td>50\/60Hz<\/td>\n<\/tr>\n<tr>\n<td>Container Dimensions<\/td>\n<td>12,196 \u00d7 2,438 \u00d7 2,896mm<\/td>\n<\/tr>\n<tr>\n<td>Shipping Weight<\/td>\n<td>Approximately 11 tonnes<\/td>\n<\/tr>\n<tr>\n<td>Operating Weight<\/td>\n<td>Approximately 17.2 tonnes<\/td>\n<\/tr>\n<tr>\n<td>Cooling-Tower Type<\/td>\n<td>External dry-cooling tower<\/td>\n<\/tr>\n<tr>\n<td>Heat-Dissipation Capacity<\/td>\n<td>Approximately 1,500kW<\/td>\n<\/tr>\n<tr>\n<td>Coolant Connection<\/td>\n<td>DN100<\/td>\n<\/tr>\n<tr>\n<td>Container Certifications<\/td>\n<td>CCS\/CE\/UL options<\/td>\n<\/tr>\n<tr>\n<td>Application<\/td>\n<td>Industrial Bitcoin mining and hosting projects<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>Specifications should be confirmed against the final BITMAIN technical documentation and selected project configuration before purchase.<\/p>\n<hr \/>\n<h2>Suitable Applications<\/h2>\n<h3>New Bitcoin Mining Sites<\/h3>\n<p>Deploy standardized hydro-mining capacity without constructing the complete cooling system from the ground up.<\/p>\n<h3>Existing Mining-Farm Expansion<\/h3>\n<p>Add hydro-cooled capacity to a site with sufficient power, land, network connectivity and supporting infrastructure.<\/p>\n<h3>Hosting Operations<\/h3>\n<p>Build modular hosting capacity for customers using compatible S19, S21 and S23 Hydro miners.<\/p>\n<h3>Energy and Curtailment Projects<\/h3>\n<p>Deploy mining loads near stranded, interruptible or underutilized power resources, subject to grid and project requirements.<\/p>\n<h3>Hot or Water-Restricted Regions<\/h3>\n<p>The dry-cooling configuration can reduce water dependence, but site-specific thermal calculations remain essential.<\/p>\n<hr \/>\n<h2>Site Requirements<\/h2>\n<p>Before ordering an ANTSPACE HD5, the project should confirm:<\/p>\n<ul>\n<li>Available utility or transformer capacity<\/li>\n<li>400V three-phase electrical infrastructure<\/li>\n<li>Grounding and electrical protection<\/li>\n<li>Suitable transformer and switchgear<\/li>\n<li>Concrete foundation and installation area<\/li>\n<li>Ambient-temperature design conditions<\/li>\n<li>Miner model and total heat load<\/li>\n<li>Dry-cooler placement and airflow<\/li>\n<li>Coolant and piping requirements<\/li>\n<li>Stable internet connectivity<\/li>\n<li>Crane and unloading access<\/li>\n<li>Local permits and safety requirements<\/li>\n<li>Commissioning and maintenance plan<\/li>\n<\/ul>\n<p>The ANTSPACE HD5 is a major infrastructure component, not a complete mining site by itself. Transformers, medium-voltage systems, civil works, network equipment, installation and commissioning may need to be quoted separately.<\/p>\n<hr \/>\n<h2>Why Buy the ANTSPACE HD5 from PunkHash?<\/h2>\n<p>PunkHash helps customers evaluate the complete mining project\u2014not only the container.<\/p>\n<p>Our team can assist with:<\/p>\n<ul>\n<li>ANTSPACE HD5 sourcing<\/li>\n<li>Compatible hydro-miner selection<\/li>\n<li>Miner and container capacity planning<\/li>\n<li>Transformer and power-equipment matching<\/li>\n<li>International logistics<\/li>\n<li>Site deployment coordination<\/li>\n<li>Cooling and electrical requirement review<\/li>\n<li>Bulk ASIC miner procurement<\/li>\n<li>ROI scenario analysis<\/li>\n<li>After-sales coordination<\/li>\n<\/ul>\n<p>Share your available power, electricity price, location, preferred miner model and deployment schedule. We will help you evaluate whether the ANTSPACE HD5 is suitable for your site.<\/p>\n<hr \/>\n<h2>Frequently Asked Questions<\/h2>\n<h3>How many miners can the ANTSPACE HD5 hold?<\/h3>\n<p>The HD5 provides up to 308 rack spaces. Actual usable capacity depends on the selected miner model, power draw and cooling requirements.<\/p>\n<h3>Which miners are compatible with the HD5?<\/h3>\n<p>It is designed for selected Antminer S19 Hyd, S21 Hyd and S23 Hyd series miners. Exact compatibility must be confirmed before ordering.<\/p>\n<h3>Does the HD5 include a cooling tower?<\/h3>\n<p>The complete system is designed to operate with an external dry-cooling tower. The final quotation must clearly state whether the dry cooler, piping, cables and other accessories are included.<\/p>\n<h3>Is the transformer included?<\/h3>\n<p>A transformer should not be assumed to be included unless it is specifically listed in the quotation. Transformer capacity and voltage must be matched to the site and total system load.<\/p>\n<h3>Is the ANTSPACE HD5 a complete mining farm?<\/h3>\n<p>No. The HD5 provides the containerized mining, power-distribution and cooling platform. The site may still require transformers, medium-voltage equipment, foundations, cabling, internet, drainage, installation and commissioning.<\/p>\n<h3>Can PunkHash supply the miners together with the container?<\/h3>\n<p>Yes. PunkHash can prepare a combined proposal covering the HD5, compatible hydro miners, power equipment, logistics and project deployment requirements.<\/p>\n<hr \/>\n<h2>Request a Project Quote<\/h2>\n<p>To receive an accurate ANTSPACE HD5 proposal, please provide:<\/p>\n<ul>\n<li>Project country and site location<\/li>\n<li>Available electrical capacity<\/li>\n<li>Site voltage<\/li>\n<li>Electricity price<\/li>\n<li>Preferred hydro miner model<\/li>\n<li>Required number of containers<\/li>\n<li>Target deployment date<\/li>\n<li>Transformer availability<\/li>\n<li>Required delivery scope<\/li>\n<li>Installation or commissioning requirements<\/li>\n<\/ul>\n<p><strong>PunkHash \u2014 Compute the Future, Together.<\/strong><\/p>\n<p>[Request a Quote] [Contact Our Infrastructure Team]<\/p>\n","protected":false},"excerpt":{"rendered":"<p>Deploy up to 308 compatible hydro ASIC miners with the BITMAIN ANTSPACE HD5 1.5MW mining container and integrated dry-cooling solution. Get pricing and project support from PunkHash.<\/p>","protected":false},"featured_media":13316,"comment_status":"open","ping_status":"closed","template":"","meta":[],"product_brand":[],"product_cat":[125,98,195],"product_tag":[196,130,197,200,201],"class_list":["post-13314","product","type-product","status-publish","has-post-thumbnail","product_cat-bitmain","product_cat-accessories","product_cat-other","product_tag-asicminer","product_tag-bitcoin","product_tag-bitcoinminer","product_tag-hydro-cooling-mining","product_tag-hydro-cooling-mining-container","first","instock","shipping-taxable","purchasable","product-type-simple"],"_links":{"self":[{"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/product\/13314","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/product"}],"about":[{"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/types\/product"}],"replies":[{"embeddable":true,"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/comments?post=13314"}],"version-history":[{"count":1,"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/product\/13314\/revisions"}],"predecessor-version":[{"id":13315,"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/product\/13314\/revisions\/13315"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/media\/13316"}],"wp:attachment":[{"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/media?parent=13314"}],"wp:term":[{"taxonomy":"product_brand","embeddable":true,"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/product_brand?post=13314"},{"taxonomy":"product_cat","embeddable":true,"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/product_cat?post=13314"},{"taxonomy":"product_tag","embeddable":true,"href":"https:\/\/www.punkhash.com\/ru\/wp-json\/wp\/v2\/product_tag?post=13314"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}