ASIC water cooling tube connector – Fit & Buying Guide
ASIC water cooling tube connector. A threaded push-fit tube fitting for a matched ASIC cooling manifold or cold plate, with size options selected for the actual tube and port. Entry option price; confirm size and scope.
$0.50
9999 vorrätig
Zahlungsart
Angesichts der sich rasch verändernden Marktlage können die Preise für Bergbaumaschinen Schwankungen unterliegen. Bitte erkundigen Sie sich vor der Zahlung bei unserem Vertriebsteam nach dem aktuellen Preis, um finanzielle Verluste zu vermeiden.
Sparen Sie Versandkosten, wenn Sie zwei oder mehr Maschinen bestellen! Kontaktieren Sie noch heute unser Vertriebsteam, um das beste Angebot zu erhalten.
Beschreibung:
ASIC water cooling tube connector: A threaded push-fit tube fitting for a matched ASIC cooling manifold or cold plate, with size options selected for the actual tube and port. PunkHash helps buyers define the part and installation scope before combining it with the rest of a mining cooling circuit.
ASIC water cooling tube connector: selection details
| Construction described | 304 stainless steel body with internal brass and sealing elements |
|---|---|
| Series choices | IPC08, IPC10 and IPC12 families |
| Thread variants | G01, G02, G03 and G04 variants; confirm thread standard and dimensions |
| Example small fitting | IPC08-G01 for matched 8mm outside-diameter tubing |
The live product page starts at US$0.50, while the catalog card shows a different entry amount. This listing uses the live page entry price. Price and fit depend on the selected diameter and thread. A tube fitting is not interchangeable with a complete miner-specific quick-disconnect coupling pair.
Match the complete connection
Measure the pipe bore, outside diameter, port thread and available installation clearance. The sealing material must suit the selected coolant and working temperature. Confirm the installation pressure with the system supplier. Avoid sharp bends, unsupported hose loads and mixing visually similar fitting sizes. A qualified installer should check the assembled circuit before the miner is energized.
Related electronics and service parts
Vergleichen replacement control boards by controller revision and firmware. Check mining power supplies against the miner voltage, output and communication interface. These catalogs are matching resources; a cooling accessory does not establish electronic compatibility.
Buyer questions about the ASIC water cooling tube connector
What information is needed for a matched quote?
Send the exact miner model, board or part revision, clear connection photographs, quantity and delivery country. For a radiator or pump, include the intended loop arrangement and operating heat load. Confirm the selected configuration, supplied accessories and selling unit in the itemized quotation.
How should the installation location affect selection?
Share the summer ambient temperature and available electrical supply. Sites in the UAE or Texas should evaluate heat rejection at their hottest expected conditions. In colder locations, discuss freeze protection and start-up conditions with the system designer. Shipping cost and delivery time depend on destination and the confirmed order.
Request a matched ASIC water cooling tube connector quotation from PunkHash. We can review the proposed component combination before you place the order.

Zum Thema Verkehr:Vorrätige Miner werden innerhalb von 3 Werktagen versandt. Bei Großbestellungen, die per DHL Express, UPS, FedEx oder TNT versandt werden, rechnen Sie bitte mit einer zusätzlichen Bearbeitungszeit von 1–2 Tagen.
Die Lieferzeiten für vorbestellte Miner hängen vom Produktionsplan des Herstellers ab. Die voraussichtlichen Versandtermine werden auf der Bestellseite angegeben; jedoch kann es aufgrund von produktionsbedingten Problemen zu Verzögerungen beim tatsächlichen Versand kommen.
Unser Versandverfahren erfolgt nach dem Prinzip “Wer zuerst bezahlt, wird zuerst beliefert”. Sobald die vollständige Zahlung eingegangen ist, bemühen wir uns, den Versand so schnell wie möglich zu veranlassen. Zahlungen per Banküberweisung (T/T) können 3–7 Werktage zur Überprüfung benötigen, während Zahlungen per Kryptowährung in der Regel innerhalb weniger Stunden bis zu einem Werktag bestätigt werden.
Der internationale Versand dauert in der Regel 5–8 Werktage; in abgelegenen Regionen kann sich die Lieferzeit auf 8–10 Werktage verlängern.
*Alle Transaktionen gelten als endgültige Verkäufe und sind nach Abschluss nicht mehr erstattungsfähig. Wir bitten um Ihr Verständnis, dass dies branchenüblich ist.
Rezensionen
Filter löschenEs gibt noch keine Rezensionen.