Bitmain Antminer S21 XP Hydro 473Th/s 5670W BTC Mining
Model Antminer S21 XP Hyd (473Th) from Bitmain mining SHA-256 algorithm with a maximum hashrate of 473Th/s for a power consumption of 5670W.
$1,550.00
Payment Method
Given the rapidly changing market, mining machine prices may fluctuate; please confirm the latest price with our sales team before making payment to avoid financial losses.
Save on shipping costs when you order two or more machines! Contact our sales team today to get the best quote.
Description:
Antminer S21 XP Hydro Description
Introducing the Antminer S21 XP Hydro, Bitmain’s latest water-cooled Bitcoin mining powerhouse. Designed for efficiency, it achieves an impressive 473Th/s hashrate with a power consumption of 5670W, running on the SHA-256 algorithm. With an outstanding efficiency of 12J/T, this miner is perfect for maximizing cryptocurrency mining operations. Elevate your mining setup with the Antminer S21 XP Hydro and lead in the competitive world of crypto mining.
Specifications
| Manufacturer | Bitmain |
| Model | Antminer S21 XP Hyd |
| Hashrate | 473 TH/s |
| Power | 5360W |
| Size | 410 x 170 x 209mm |
| Noise level | 50db |
| Cooling | Hydro Cooling |
| Voltage | 380-415V |
| Coolant Flow, L/min | 8.0~10.0 |
| Coolant pressure, bar | ≤3.5 |
| Coolant PH value | Antifreeze: 7.0~9.0 |
| Prue water: 6.5~7.5 | |
| Deionized water:8.5~9.5 | |
| Working coolant | Antifreeze/ Pure water/Deionized water |
| Interface | Ethernet |
| Temperature | 5 – 45 °C |
| Humidity | 5 – 95 % |
About transportation:In-stock miners will be shipped within 3 business days. For bulk orders shipped via DHL Express, UPS, FedEx, or TNT, please allow an additional 1–2 days for processing.
Delivery times for pre-order miners depend on the factory’s production schedule. Estimated shipping dates are provided on the order page; however, actual shipments may be subject to delays due to production-related issues.
Our shipping process operates on a “first-pay, first-ship” basis. Once full payment has been received, we will strive to arrange shipment as quickly as possible. Payments made via bank wire transfer (T/T) may take 3–7 business days to verify, whereas payments made via cryptocurrency are typically confirmed within a few hours to 1 business day.
International shipping typically takes 5–8 business days; for remote regions, transit times may extend to 8–10 business days.
*All transactions constitute final sales and are non-refundable once completed. We appreciate your understanding that this is standard practice within the industry.
